Construction, reconstruction and rehabilitation of several road sections
Completed Projects
1. Construction of an access road v. Orizari - monastery Presveta Bogorodica, period 11/2019 - 11/2020, value 0.23 mil. EUR
- Description: The section is 1.9 km long. Works has been done on the road bed, pavement, drainage with the construction of 12 new reinforced pipe culverts along the route.

2. Reconstruction of the local road Dolno Chichevo - Gradsko, municipality of Gradsko, period 09/2019 - 06/2020, value 0.25 mil. EUR
- Description: The section is 1.8 km long. Complete reconstruction of the road pavement, replacement and improvement of the road bed surface, drainage and culverts, installation of two layers of asphalt BNS 32A and AB 16 and processing of shoulders.

3. Rehabilitation of the state road R1202 section for monastery St. Jovan Bigorski, period 05/2019 - 08/2019, value 0.38 mil. EUR
- Description: Scraping of the road was performed, installation of two layers of asphalt BNS 22 and asphalt AB 11, construction of AB retaining walls, structures of gabions and cladding walls, installation of horizontal, vertical signalization and guardrail on the road.

4. Rehabilitation of the state road R1205 section Zletovo - Probishtip, period 09/2018 - 08/2019, value 1.32 mil. EUR
- Description: The section is 17.3 km long. Complete reconstruction of the road pavement, replacement and improvement of the road bed surface, drainage, installation of two layers of asphalt BNS 22A and AB 11, construction of new curbs, processing of shoulders, marking of horizontal, placement of vertical signalization and guardrail on the road.

5. Reconstruction of the State Road R2133, section 1 Lipkovo - Matejche, period 08/2017 - 11/2020, value 1.15 mil. EUR
- Description: The section is 3.3 km long. Complete reconstruction of the road pavement, replacement and improvement of the road bed surface, drainage and construction of several paved culverts, installation of two layers of asphalt BNS 22A and AB 11 s, construction of new curbs, processing of shoulders, marking of horizontal and placement of vertical signalization on the road.

6. Construction of Expressway A3 Stip - Kocani, section Stip - Krupishte, period 05/2017 - 09/2020, value 10.25 mil. EUR
- Description: Construction of a new expressway A3 Shtip - Kochani, section from Shtip to Krupishte with a length of 14.3 km. with a width of 2 x 3.5m. lanes, 2 x 2.0m. forced stop lanes and 2 x 0.2m. edge lines, with a total road profile of 11.40 meters.

7. Rehabilitation of the state road A2 section Saraj - Grupchin, period 11/2017 - 09/2018, value 1.3 mil. EUR
- Description: Road scraping was performed, installation of two layers of asphalt BNS 22 sA and AB 11 s polymer was performed, marking of horizontal signalization.

8. Rehabilitation of the state road R1102 section Petrovec - Katlanovo, period 04/2018 - 06/2018, value 0.55 mil. EUR
- Description: Road scraping was performed, pot holes were treated with BNHS 16A, installation of final layer of asphalt AB 11 with polymer, marking of horizontal signalization.

9. Rehabilitation of the state road A1 section Petrovec - Miladinovci and state road A4 section Kadino - Hipodrom, period 07/2017 - 05/2018, value 0.58 mil. EUR
- Description: Road scraping was performed, pot holes were treated with BNHS 16A, installation of final layer of asphalt AB 11 with polymer, marking of horizontal signalization.